Weekly Report
Reedy Creek
As of September 28, 2026 · Richmond, VA
Property & development
Home values
How the City has assessed property in Reedy Creek, 2022–2026.
Of Reedy Creek's $40M in assessed-value growth since 2022, about 3% ($1M) is new construction: new buildings and major projects. The rest is the City reassessing existing property at higher values. How we tell construction from reassessment →
Typical home is the median change across the 439 homes assessed in both 2022 and 2026 — half rose by more, half by less. Growth rank places Reedy Creek among the 133 Richmond neighborhoods with at least 50 such homes (1 = fastest growth).
Source: City of Richmond Assessor (published 2026-05-26). data file ↗ · search portal ↗
Special use & zoning
Special-use permits in Reedy Creek: open applications still in the pipeline, plus recent filings and adopted permits. Each links to the City's record. See all open SUPs citywide, with what each is for →
No open special-use permits or recent zoning activity.
Service requests (311)
At a glance
311 service requests in Reedy Creek — opened, closed, and the standing backlog.
Biggest open backlogs
Service requests still open in Reedy Creek, by type, with the age of the oldest.
| Type | Open | Oldest |
|---|---|---|
| Repair Sidewalk or Ramp | 39 | 7.4 yrs |
| Assess Existing Tree or Stump | 39 | 4.3 yrs |
| Clean Stormwater Drain | 10 | 5.3 yrs |
| Maintain Grass or Vegetation in Public Right of Way | 5 | 2.2 yrs |
| Assess Standing Water | 5 | 1.2 yrs |
| Report Neighborhood Roadway Safety Concern | 3 | 253 days |
| Repair Road | 3 | 2.0 yrs |
| Repair Curbs and Gutters | 2 | 4.2 yrs |
This week
Top categories opened
| Report Odor from Sewer | 1 |
| Request Residential Trash Can | 1 |
Top categories closed
| Assess Standing Water | 1 |
| Request Residential Trash Can | 1 |
Last 30 days: 13 opened, 13 closed.