DPW000249556
Report Public Right of Way Concern
Public Works
- Requested
- October 28, 2026
- Subtype
- Construction site with no pedestrian walkway
- Location
- 901 Bank St, 23219
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 6
- Neighborhood
- Capitol District
Description
Up until this week, this construction project left the sidewalk open for pedestrians (and cyclists) to cut through Bank St. Now, the gates are moved and the sidewalk is blocked, with no closed sidewalk signs or detour. I looked on the city’s portal, but couldn’t find the permit. If there isn’t one, it would be great to have this opened back up. Bank St. is a common connector between the east end and the Franklin St bike lanes, and I use this section to commute 3 times a week.
Details
- Is a Permit Visible?
- No Permit Visible
History
- October 28, 2026The service request is submitted.
- October 28, 2026The service request status has been changed to Assigned to Department.
- October 28, 2026The service request status has been changed to Assigned to Engineer.
- October 28, 2026The service request status has been changed to In Progress.