DPW000249556

Report Public Right of Way Concern

Public Works

How we assembled this data →

CompletedClosed October 30, 2026
Requested
October 28, 2026
Subtype
Construction site with no pedestrian walkway
Location
901 Bank St, 23219
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
6
Neighborhood
Capitol District

Description

Up until this week, this construction project left the sidewalk open for pedestrians (and cyclists) to cut through Bank St. Now, the gates are moved and the sidewalk is blocked, with no closed sidewalk signs or detour. I looked on the city’s portal, but couldn’t find the permit. If there isn’t one, it would be great to have this opened back up. Bank St. is a common connector between the east end and the Franklin St bike lanes, and I use this section to commute 3 times a week.

Details

Is a Permit Visible?
No Permit Visible

History

  1. October 28, 2026
    The service request is submitted.
  2. October 28, 2026
    The service request status has been changed to Assigned to Department.
  3. October 28, 2026
    The service request status has been changed to Assigned to Engineer.
  4. October 28, 2026
    The service request status has been changed to In Progress.