DPW000234784
Report Public Right of Way Concern
Public Works
- Requested
- May 7, 2026
- Subtype
- Construction site with no pedestrian walkway
- Location
- 301 Hull St, 23224
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 6
- Neighborhood
- Old Town Manchester
Description
Both construction sites going on have blocked off access to sidewalks on either side of Hull Street. This would require pedestrians to either go all the way around on Brander Street (which also has a sidewalk closed) or back track and go down 2nd Street to Decatur to then 4th street if they want to get further down Hull Street and vice versa to the Mayo Bridge. It's absurd that the construction companies did not provide adequate detours for pedestrians. Fastest route would be walking ON Hull St.
Details
- Is a Permit Visible?
- No Permit Visible
History
- May 7, 2026The service request is submitted.
- May 7, 2026The service request status has been changed to Assigned to Department.
- May 7, 2026The service request status has been changed to Assigned to Engineer.