Beta release. We are still refining and welcome feedback.

DPW000218489

Repair Electronic Traffic Signal

Public Works

How we assembled this data →

CompletedClosed October 31, 2025
Requested
October 25, 2025
Subtype
Traffic Signal Repair
Location
2201 W Leigh St, 23220
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
2
Neighborhood
Museums

Description

Requesting a lengthening of the green turn arrow from Eastbound Leigh onto Northbound Hermitage. Due to the continued closure of the northbound lane on Boulevard for the stadium construction, AABlvd traffic is being routed to this intersection to then turn left onto Hermitage. The left turn signal cycle needs to be significantly longer to allow for all the extra traffic to get through. Right now only four or five cars can get through at a time and there are frequently very long backups.

Details

Vehicle or Pedestrian Signal
Vehicle Signal

History

  1. October 26, 2025
    The service request is submitted.
  2. October 26, 2025
    The service request status has been changed to Assigned to Department.
  3. October 31, 2025
    The service request status has been changed to Completed.

Comments

  • Staff · October 26, 2025
    Cityworks ID: 569187
  • Staff · October 27, 2025
    Unfortunately there is a lot of construction and road closures in the area right now and every possible step is being taken to adjust the signal timings here and other signals nearby but some delays / backups are to be expected
  • Staff · October 31, 2025
    Still under Engineering assessment due to on-going construction

Spotted a problem with this record?