DPW000171924
Repair Sidewalk or Ramp
Public Works
- Requested
- April 29, 2024
- Subtype
- Concrete Sidewalk Repair
- Location
- 2300 Park Ave, 23220
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 2
- Neighborhood
- The Fan
Description
Caller there was repair to the water meter and the concrete sidewalk was removed. The meter was repaired and the caller states the concrete sidewalk was replaced with gravel and the gravel is holding water. Caller is requesting to have the sidewalk replaced with concrete. Repair on Park Avenue and Strawberry Street, on the Strawberry Street side of the street.
Details
- Immediate Danger to Person or Property
- No
- Was damaged caused by recent accident or storm?
- No
History
- April 29, 2024The service request is submitted.
- April 29, 2024The service request status has been changed to Assigned to Department.
- May 23, 2024The service request status has been changed to Completed.
Comments
- Staff · April 29, 2024Cityworks ID: 528045
- Staff · May 23, 2024This location has been inspected on 5/22/2024. There was work done at this location by the Department of Public Utilities (DPU) (gas, water, etc.) division. DPU is responsible for this repair. We will contact the DPU division that we believe is responsible. Please go back through the 311 system and route this request to DPU.