DPW000119818
Repair Sidewalk or Ramp
Public Works
- Requested
- September 9, 2022
- Subtype
- Concrete Sidewalk Repair
- Location
- 3303 Gloucester Road, 23227
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 3
- Neighborhood
- Sherwood Park
Description
Concrete Side Walk raised and in Need of repair- Tripping hazard
Details
- Immediate Danger to Person or Property
- Yes
History
- September 9, 2022The service request is submitted.
- September 9, 2022The service request status has been changed to Assigned to Department.
- September 22, 2022The Reporter logged a follow-up request from a constituent.
- January 4, 2023The Reporter logged a follow-up request from a constituent.
- March 4, 2026The service request status has been changed to Completed.
Comments
- Staff · September 9, 2022Cityworks ID: 481929
- Staff · September 17, 2022This location has been inspected on ____9-17-22 _40__ X___5_ feet of damaged Concrete sidewalk. The repair will be conducted according to the rating system and safety hazard concerns.
- Staff · September 17, 2022This location has been inspected on __9-17-22 This location has ____30__ linear feet of curb and gutter damage. The repair will be conducted according to the rating system and safety hazard concerns.
- System · September 22, 2022Citizens states that the leaves are covering the sidewalk, which is causing more dangers, because the sidewalk is sitting up in the air.
- System · September 27, 2022Left message identifying that investigation has been completed and work should be done within 180 days from investigation.
- System · January 4, 2023Caller is frustrated and wants to speak to a Sup today....caller is calling back in reference to a service request status; caller states the sidewalk is very dangerous and people are falling and getting hurt thinking that they are responsible. Caller was advised of the last comments and that I could email to have concern escalated but she insisted on speaking with a Sup. today (caller transferred to Sup tele. # and emailed)
- System · January 4, 2023Voicemail left following up on ticket being opened, advised again in message that the request should be completed within 180 days of the investigation that was completed on September 17th. Left my direct line if she had additional questions
- Staff · July 11, 2024This location is part of a CIP project that is scheduled to be completed within the next 2 years.
- Staff · March 4, 2026This location was completed as a Capital Improvement Project on 2-25-2025.