DPW000093913
Repair Sidewalk or Ramp
Public Works
- Requested
- November 17, 2021
- Subtype
- Concrete Sidewalk Repair
- Location
- 2613 Fendall Ave, 23222
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 3
- Neighborhood
- Northern Barton Heights
Description
2600 Block of Fendall Avenue from one end of the block to the other end has 4 trees that uprooted from ground Caller a several children has tripped indicated but not hurt; the sidewalk is buckled from very the ground from the roots; (2) Handicap ramps on both sides of th block.
Details
- Immediate Danger to Person or Property
- Yes
History
- November 17, 2021The service request is submitted.
- November 17, 2021The service request status has been changed to Assigned to Department.
- February 23, 2023The Reporter logged a follow-up request from a constituent.
- April 17, 2025The service request status has been changed to Completed.
Comments
- Staff · November 17, 2021Cityworks ID: 458525
- Staff · July 28, 2022This location has been inspected on __7-28-22 __5_ X_25___ feet of damaged concrete sidewalk. The repair will be conducted according to the rating system and safety hazard concerns. There is also damageat 2615 / 20 feet by 5 feet of damage.
- System · February 23, 2023Caller states his grandson tripped on the sidewalk and hurt his knee... Caller states this has been and still is a safety hazard....He had placed a request for repair a year ago....and is concerned that still to date the sidewalk hasn't been repaired...Caller wants to know when to expect the repair work? (escalated to Sup by email )
- Staff · February 24, 2023This location has been inspected on ___2-24-23 This request has been sent to the CIP division and will be reviewed for project funding and prioritization based on repair criteria. The CIP division repairs sidewalks based on available funding and a risk based repair criteria.
- System · June 6, 2023Contacted Mayor's office, I provided message below regarding CIP funding on voicemail
- Staff · April 17, 2025This Capital Improvement Project was completed on 4-9-2025.