DPW000091002
Repair Sidewalk or Ramp
Public Works
- Requested
- October 6, 2021
- Subtype
- Concrete Sidewalk Repair
- Location
- 6700 Hanover Ave, 23226
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 1
- Neighborhood
- Three Chopt
Description
please repair side walk
Details
- Immediate Danger to Person or Property
- Yes
History
- October 6, 2021The service request is submitted.
- October 6, 2021The service request status has been changed to Assigned to Department.
- November 9, 2021The Reporter logged a follow-up request from a constituent.
- June 20, 2023The Reporter logged a follow-up request from a constituent.
- July 29, 2024The Reporter logged a follow-up request from a constituent.
- August 28, 2024The Reporter logged a follow-up request from a constituent.
- September 16, 2024The Dispatcher logged a follow-up request from a constituent.
- March 28, 2025The Dispatcher logged a follow-up request from a constituent.
- May 2, 2025The Dispatcher logged a follow-up request from a constituent.
- August 21, 2025The service request status has been changed to Completed.
Comments
- Staff · October 6, 2021Cityworks ID: 455978
- System · November 9, 2021Following up
- Staff · July 11, 2022CIP to repair the sidewalk at 6702 to 6710 Hanover Ave 125ft. x 5ft. of damage at this location needs repairs asap.
- Staff · July 20, 2022125x5ft. of damaged 6702 to 6710 repairs needed asap.
- System · June 20, 2023Follow up; Checking on the status of service request; For 6702 Hanover Ave; Sent email to Supervisor;
- Staff · June 21, 2023This location has been inspected on 6/21/2023. Photos have been updated to city works.
- Staff · June 21, 2023This location has Been inspected on 6/21/2023. 180x5 ft. section of damaged and uneven concrete sidewalk due to tree roots. The request has been sent to CIP division and will be reviewed for project funding and prioritization based on repair criteria. The CIP division repairs based on available funding and a risk repair criteria.
- Staff · July 24, 20245' x 5' and 5' x 5' at 6702, 15' x 5' at 6704, 40' x 5' at 6708 (total 65' x 5') of concrete sidewalk lifted from tree roots. The repair will be conducted according to the rating system and safety hazard concerns.
- Staff · August 21, 2025This Capital Improvement Project was completed on 8-21-2025.