Beta release. We are still refining and welcome feedback.

DPW000087727

Traffic and Street Signs

Public Works

How we assembled this data →

CompletedClosed September 23, 2021
Requested
August 26, 2021
Subtype
Request New Traffic Sign
Location
N 29th St & S St
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
7
Neighborhood
Church Hill North

Description

NORTH 29TH ST NEEDS A NEW STOP SIGN BETWEEN S ST AND T ST

History

  1. August 26, 2021
    The service request is submitted.
  2. August 26, 2021
    The service request status has been changed to Assigned to Department.
  3. September 23, 2021
    The service request status has been changed to Completed.

Comments

  • Staff · August 26, 2021
    Cityworks ID: 452903
  • Staff · September 23, 2021
    29th St and S St has an all-way stop. The Department of Public Works (DPW) must perform an engineering study in accordance with the Federal Manual on Uniform Traffic Control Devices before installing anall-way stop. All all-way stops must meet the warrants in the Manual on Uniform Traffic Control Devices (MUTCD). This is a federal publication that applies to all streets open to pubic travel. The MUTCD conditions are mainly about a combination oftraffic on the free flow street and the stopped street. This is basically how the MUTCD warrant works: - The traffic volumes along the free flow street (major street) and the stopped street (minor street) must be at a certain level for each hour for eight hours of a week day to meet the requirements of the MUTCD all-way stop warrants. o Major street minimum requirement (total of both approaches) = 300 or more vehicles an hour. o Minor street minimum requirement (total of both approaches) = 200 or more vehicles an hour. - Both of these traffic conditions must be met. The intersection of N. 29th St and T St does not meet these volume conditions for an all-way stop.

Spotted a problem with this record?