Beta release. We are still refining and welcome feedback.

DPW000080054

Repair Sidewalk or Ramp

Public Works

How we assembled this data →

This record has been open for 5 years. Its current status may differ from what is shown here — the city may have resolved it without updating the record, or a status change may not have reached our collector.
Assigned
Requested
May 31, 2021
Subtype
Concrete Sidewalk Repair
Location
2126 Floyd Ave, 23220
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
2
Neighborhood
The Fan

Description

Sidewalk not repaired after City Water Meter was replaced.

Details

Immediate Danger to Person or Property
Yes

History

  1. May 31, 2021
    The service request is submitted.
  2. May 31, 2021
    The service request status has been changed to Assigned to Department.

Comments

  • Staff · May 31, 2021
    Cityworks ID: 445590
  • Staff · July 27, 2022
    This location has been inspected on ___7-27-22_______15 ___ X__5__ feet of damaged concrete sidewalk. The repair will be conducted according to the rating system and safety hazard concerns.

Spotted a problem with this record?