DPW000058492

Repair Road

How we assembled this data →

CompletedClosed June 15, 2022
Requested
August 18, 2020
Subtype
Street Pavement Repair
Location
3942 Patsy Ann Dr, 23234
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
8
Neighborhood
Cottrell Farms

Description

Citizen states that there was a storm and washed away all the gravel that was there but the street is paved and the gravel just needs to be replaced.

History

  1. August 18, 2020
    The service request is submitted.
  2. August 18, 2020
    The service request status has been changed to Assigned to Department.
  3. August 4, 2021
    The Reporter logged a follow-up request from a constituent.
  4. August 20, 2021
    The Reporter logged a follow-up request from a constituent.
  5. January 27, 2022
    The Reporter logged a follow-up request from a constituent.
  6. June 15, 2022
    The service request status has been changed to Completed.

Comments

  • Staff · August 18, 2020
    Cityworks ID: 426015
  • System · August 4, 2021
    Follow up! this is by the mailbox and the huge hole by the mailbox. It is so deep now that the orange clay is showing and with each rain it is getting worse and and corroding the retaining wall of the citizen residence.
  • System · August 20, 2021
    Caller phoned back in to check on status of request, states hole at edge of road is now 2 feet deep in front of mailbox & that erosion on the pavement continues to be an issue
  • System · January 27, 2022
    Follow up Citizen states the issue has worsen since he last called and was told someone would be out to investigate he would like a call back with a time frame on when this will be addressed
  • System · January 27, 2022
    citizen states the postal service states him a warning it needs to be fixed because is it damaging there vehicles
  • Staff · June 15, 2022
    DPU Storm Water Division & DPW Roadway Maintenance Division completed this request by restoring the approximately 100lft of asphalt valley gutter in front of 3942 Pasty Ann Dr on 6/14/2022. All areas affected during this work was restored by DPW in harmony with the City of Richmond recommendations & standards.
  • Staff · June 15, 2022
    William Tolson, Supervisor & Raymond White, Equipment Operator Senior performed this worked for DPU Storm Water Division. Debbie Randolph Supervisor for DPW along with her crew performed asphalt work for DPW.

Spotted a problem with this record?