DPU000027216

Clean Stormwater Drain

Public Utilities

How we assembled this data →

CompletedClosed September 3, 2024
Requested
June 5, 2024
Subtype
Basin Cleaning
Location
W Main St & S Mulberry St
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
5
Neighborhood
The Fan

Description

After every rain the curbside of the entire block floods and holds standing water for days.

Details

Is the inlet/basin clogged?
Yes
Is the street flooding?
Yes
Is there an odor coming from the basin?
No

History

  1. June 5, 2024
    The service request is submitted.
  2. June 5, 2024
    The service request status has been changed to Assigned to Department.
  3. September 3, 2024
    The service request status has been changed to Completed.

Comments

  • Staff · June 5, 2024
    Cityworks ID: 531015
  • Staff · June 6, 2024
    Request has be relay to Field Supervisor for assessment please allow time for Supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
  • Staff · June 29, 2024
    L.Lockett and N.Sumpter asses location the SouthWest corner has root infestation that hindering positive drainage which is at the Mulberry St inlet the Main St inlet has tree buttress over the basin case affect enter to the access point of the basin and inlet opening has asphalt overlay that has hinder the drainage due it small opening.
  • Staff · June 29, 2024
    L.Lockett and N.Sumpter asses location the SouthWest corner has root infestation that hindering positive drainage which is at the Mulberry St inlet the Main St inlet has tree buttress over the basin case affect enter to the access point of the basin and inlet opening has asphalt overlay that has hinder the drainage due it small opening.
  • Staff · July 2, 2024
    A.Eaddy, and S.Crews stated that service request was completed, crew clean location with high pressure water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum. Also Location was service for Root infestation with Root treatment. DPU basin team S.Saunders and H.Sheppardson cut the inlet enter point wide as roadway asphalt has almost closed the mouth of the inlet. Urban Forestry has been contract about the tree buttress that grew over the entry point of the basin top .