DPU000020958

Repair Stormwater Drain

Public Utilities

How we assembled this data →

CompletedClosed January 27, 2024
Requested
October 6, 2022
Subtype
Repair Basin
Location
3001-3099 N Arthur Ashe Blvd N
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
2
Neighborhood
The Diamond

Description

The atrom water drain is completely smashed like a truck drove over it

Details

Is the concrete or brick missing?
Concrete missing
Is metal exposed?
Yes
Is the top or cover missing?
Not missing
Approximate size of the opening?
Greater than 12 inches
Is the problem in the rear of the property?
No
Is the problem in the front of the property?
Yes
Is the problem on the side of the property?
No

History

  1. October 6, 2022
    The service request is submitted.
  2. October 6, 2022
    The service request status has been changed to Assigned to Department.
  3. January 27, 2024
    The service request status has been changed to Completed.

Comments

  • Staff · October 6, 2022
    Cityworks ID: 484006
  • Staff · January 27, 2024
    ADDO Enterprise Completed this repair due to scope of work that exceeding DPU Storm Water Maintenance ability at this time. DPU made the location safe with a VDOT approved jersey barrier. Brick Drop Inlet totally rehab & sidewalk / C & G reinforced with #4 rebar (two layers) to strength the structure. Inlet damaged likely due to heavy vehicles. Note: Concrete found washed in storm water pipe. Contractor removed excessive concrete & repaired one section on 4' x 15" concrete storm pipe by replacing with PVC pipe schedule 40 with a Fernco Coupling. Sidewalk & closed for sidewalk closed for 7 days days week to allow curing time & jersey barriers left in place for 14 days to ensure curing time due to extreme cold temp. Concrete was covered each day to assist in concrete setting up properly. Water valve found leaking onsite before demo began. Water Distribution turn off valve until repairs could be made. Wastewater Division delivery PVC pipe & Fernco. Storm Water Division retrieve existing square / rectangle casting - top for future use at another site. New casting & round top installed.