DPU000018615
Assess Standing Water
Public Utilities
- Requested
- March 23, 2022
- Subtype
- Assess Stormwater
- Location
- 100 E Main St, 23219
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 2
- Neighborhood
- Monroe Ward
Description
Every time it rains, this stormdrain does not drain and floods the street and both crosswalks. It makes it unsafe for pedestrians and people waiting for the bus at this bus stop.
Details
- Problem area
- Street
- Is there standing water?
- Yes
- Is the problem in the rear of the property?
- No
- Is the problem in the front of the property?
- Yes
- Is the problem on the side of the property?
- Yes
- Is there a erosion issue?
- No
- Is the problem in the creek or stream?
- No
- Is this related to vegetation?
- No
History
- March 23, 2022The service request is submitted.
- March 23, 2022The service request status has been changed to Assigned to Department.
- December 28, 2022The service request status has been changed to Completed.
Comments
- Staff · March 23, 2022Cityworks ID: 467163
- Staff · March 24, 2022lease allow 15 days for Supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
- Staff · August 26, 2022N.Sumpter,S.Crews and C.JordanThis location had 2 of 2 that were inspected for clean and service, 2 of 2 needs service and is marked. Sediment and Debris.
- Staff · December 28, 2022DPU Stormwater contractors PipeVision are assigned to this location and have as a prevented maintained routine, the crew clean location with high water and a vacuum truck. Crew clean sub and basin with a high-pressure hose and high-pressure vacuum.