DPU000017297
Assess Standing Water
Public Utilities
- Requested
- November 30, 2021
- Subtype
- Assess Stormwater
- Location
- 5713 Bondsor Lane, 23225
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 4
- Neighborhood
- Cedarhurst
Description
The water backs up onto the property in the front ditch of the city easement. Erosion of my property is now occurring. In the back of the property, the city easement has not been cleared therefore the water backs up and stands in my back yard. Address is 5613 Bondsor Lane for this request of storm ater drainage in the front and back of the property. This request was made November 2021. I have not heard from the City in regards to this request neither has it been surveyed and certainly not completed.
Details
- Problem area
- Ditch
- Is there standing water?
- No
- Is the problem in the rear of the property?
- Yes
- Is the problem in the front of the property?
- Yes
- Is the problem on the side of the property?
- No
- Is there a erosion issue?
- Yes
- Is the problem in the creek or stream?
- No
- Is this related to vegetation?
- No
History
- November 30, 2021The service request is submitted.
- November 30, 2021The service request status has been changed to Assigned to Department.
- February 6, 2024The service request status has been changed to Completed.
Comments
- Staff · November 30, 2021Cityworks ID: 459360
- Staff · October 10, 202220 ft of 12 inch driveway culvert needs to be replaced and ditch maintenance is needed.
- System · March 1, 2023Email sent to DPU for follow up on ticket
- Staff · February 6, 2024This location has been completed. Follow up of outstanding tickets in the system confirm its completion. Location was corrected by a stormwater CIP project completed in FY2023
- Staff · February 6, 2024This location has been completed. Follow up of outstanding tickets in the system confirm its completion. Problems were corrected with a stormwater CIP project that was completed in FY2023