DPU000015141
Assess Standing Water
Public Utilities
- Requested
- July 12, 2021
- Subtype
- Assess Stormwater
- Location
- 9623 Fernleigh Dr, 23235
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 4
- Neighborhood
- Huguenot
Description
Drain pipe is narrow. Wants to know can be extended. Water is running down the street in some cases. - Culvert. 9623 Fernleigh Dr 2323
Details
- Problem area
- Pipe
- Is there standing water?
- No
- Is the problem in the rear of the property?
- No
- Is the problem in the front of the property?
- Yes
- Is the problem on the side of the property?
- No
- Is there a erosion issue?
- Yes
- Is the problem in the creek or stream?
- No
- Is this related to vegetation?
- No
History
- July 12, 2021The service request is submitted.
- July 12, 2021The service request status has been changed to Assigned to Department.
- September 20, 2021The Reporter logged a follow-up request from a constituent.
- January 21, 2022The Reporter logged a follow-up request from a constituent.
- April 20, 2022The Reporter logged a follow-up request from a constituent.
- October 1, 2022The service request status has been changed to Completed.
Comments
- Staff · July 12, 2021Cityworks ID: 448793
- System · July 12, 2021Citizen would like to know if she can receive a call when someone comes out.
- System · September 20, 2021follow up on culvert being widened. states water is currently flooding street and she is concerned about road safety during travel.
- Staff · September 27, 2021M Cut ditch make it wider so water stays in the ditch the ditch is narrow, prep for asphalt to tie into the existing asphalt and curve it into the ditch. Due to COVID-19 a time frame cannot be given at this time when the work will be completed.
- System · January 21, 2022Citizen would like a call back on time frame and what will be done
- System · April 20, 2022follow up needs a call back
- System · April 20, 2022Email sent to DPU for follow up on request
- Staff · April 27, 2022I called and left a message.
- Staff · October 1, 2022A new 15 inch by 25 feet of driveway culvert was replaced and the ditch was cleaned in front of the house on 8/30/22.
- Staff · October 1, 2022An asphalt ticket was submitted for the driveway apron, the contractor will schedule it in.