DPU000014970

Report Clearing or Erosion Issues on Construction Site

Public Utilities

How we assembled this data →

CompletedClosed August 17, 2021
Requested
June 29, 2021
Subtype
Assess land disturbance or erosion
Location
101 N 29th St, 23223
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
7
Neighborhood
Church Hill

Description

Caller lives 103 N 29th St, 23223, states construction next door at 101 N 29th St had knocked down & replaced wall to build a garage but didn't backfill, issues with yard settling & caller concerned regarding slabs shifting & tool sleds collapsing

Details

Is erosion/sediment from a construction site?
Yes
Is water/sediment leaving the construction site?
No
Does issue involve clearing of trees or vegetation
No
Is erosion or land clearing on private property?
Yes
Is public right of way or city property impacted?
No
Is erosion/drainage issue affecting your property?
Yes
Is the problem near a stream or the James River?
Yes

History

  1. June 29, 2021
    The service request is submitted.
  2. June 29, 2021
    The service request status has been changed to Assigned to Department.
  3. July 26, 2021
    The Reporter logged a follow-up request from a constituent.
  4. August 16, 2021
    The Reporter logged a follow-up request from a constituent.
  5. August 17, 2021
    The service request status has been changed to Completed.

Comments

  • System · July 2, 2021
    We'll drive by today and take a look
  • System · July 26, 2021
    Caller phoned back in to check on status of request, stated problem with yard settling due to erosion is still ongoing at time of call. Provided DPU assessment date of property based on comment below
  • System · August 4, 2021
    follow up on status of request
  • System · August 17, 2021
    Still waiting on a response from Margaret Freund/ Fulton Hill Properties, the owner. Will try to touch base again today..No C.O. has been issued for this property and none will be issued until this gets resolved.
  • System · August 17, 2021
    Spoke with property owner (M. Freund) who assured me that all aspects of construction of addition has been inspected properly and approved by various departments (PDR,DPW). At this point, to have made a proper evaluation, Water Resources should have been involved from the start of this project. However, since this is classified as "renovation" and not land disturbance, no CO approval is required from us. Any undermining of Mr. Horton's property should have been brought to the attention of PDR before this project was completed. Building permit was issued on 4/19/2018 but our department was not notified until job was completed. At this point, there is nothing Water Resources can do.