DPU000013507
Clean Stormwater Drain
Public Utilities
- Requested
- March 18, 2021
- Subtype
- Basin Cleaning
- Location
- 1100 E Leigh St, 23298
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 6
- Neighborhood
- Biotech and MCV District
Description
The stormwater drain on 11th & Leigh consistently backs up with water and needs to be cleaned out. Please see the attached photo. The drain is still significantly clogged and is flooding the road.
Details
- Is the inlet/basin clogged?
- Yes
- Is the street flooding?
- Yes
- Is there an odor coming from the basin?
- Yes
History
- March 18, 2021The service request is submitted.
- March 18, 2021The service request status has been changed to Assigned to Department.
- May 11, 2021The Reporter logged a follow-up request from a constituent.
- February 4, 2022The service request status has been changed to Completed.
Comments
- Staff · March 18, 2021Cityworks ID: 440216
- Staff · March 18, 2021Request Received and dispateched to supervisor for assessment. Please allow 15 days for Supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
- Staff · March 18, 2021Location was inspected by L.Lockett 2 of 2 Basin need service as sediment was a the base of both basins the cross the road pipe need service as this could be the reason for the slow draining and standing water at this location. Crew will be schedule to serviced this location.
- System · May 11, 2021citizen calling to check status of request, citizen would like an update, citizen states she is going to reach out to doug mauby
- Staff · February 4, 2022PU Stormwater contractors PipeVision are assigned to this location have, crew clean location with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum.