DPU000012917
Clean Stormwater Drain
- Requested
- February 15, 2021
- Subtype
- Basin Cleaning
- Location
- 517 W 28th St, 23225
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 5
- Neighborhood
- Woodland Heights
Description
Clogged storm water drain causing backup in the house plumbing.
Details
- Is the inlet/basin clogged?
- Yes
- Is the street flooding?
- Yes
- Is there an odor coming from the basin?
- Yes
History
- February 15, 2021The service request is submitted.
- February 15, 2021The service request status has been changed to Assigned to Department.
- February 23, 2021The Reporter logged a follow-up request from a constituent.
- February 14, 2022The service request status has been changed to Completed.
Comments
- Staff · February 15, 2021Cityworks ID: 437907
- System · February 23, 2021Caller phoned back in to check on status, was told by DPU that service would be provided today (2/23) & looking to make sure everything is proceeding on schedule
- Staff · September 4, 2021Assessed on 8/13/2021 per Sumpter/Mayo....DPU Stormwater contractors PipeVision will be assigned to this location full of leaves and debris
- Staff · September 8, 2021DPU Storm-Water Crew Chief N. Sumpter stated free and clear no service need at this time.
- Staff · September 8, 2021The Location has seem to have a root infestation within the basin at this location.
- Staff · September 22, 2021M DPU Storm Water Personel stated that service request was completed, crew clean location with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum. Crew stated a on going root issue existed location will be place on a list as problematic issue root is location. May need to be referred to City engineers. But will use other resources in a attempt to resolve the drained issue at this location.
- Staff · February 14, 2022M.Gray(Temp), W.Mayo and S.Crews stated that service request was completed, crew clean location with high pressuse water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum. Location was also treated for roots infested.