Beta release. We are still refining and welcome feedback.

DPU000012314

Clean Stormwater Drain

How we assembled this data →

CompletedClosed February 6, 2021
Requested
December 21, 2020
Subtype
Basin Cleaning
Location
402 W 25th St, 23225
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
5
Neighborhood
Swansboro

Description

When it rains storm has standing water and water in gas line with causes tenants to have no heat; COR came 12/20/20 to pump water from gas line caused by low pressure main; please clean drain as soon as possible

Details

Is the inlet/basin clogged?
No
Is the street flooding?
No
Is there an odor coming from the basin?
No

History

  1. December 21, 2020
    The service request is submitted.
  2. December 21, 2020
    The service request status has been changed to Assigned to Department.
  3. February 6, 2021
    The service request status has been changed to Completed.

Comments

  • Staff · December 21, 2020
    Cityworks ID: 435133
  • Staff · February 6, 2021
    completed 1/25/2021....Per N. Sumpter/W. Mayo serviced this request was completed, crew cleaned location with high water and vacuum truck. Crew cleaned sub and basin with high pressure hose and high pressure vacuum. inspoected 6 and cleaned 4 inlets full of leaves

Spotted a problem with this record?