DPU000009721

Clean Stormwater Drain

How we assembled this data →

CompletedClosed January 30, 2021
Requested
July 13, 2020
Subtype
Basin Cleaning
Location
3103 Barton Ave, 23222
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
3
Neighborhood
Brookland Park

Description

Basin is clogged at Barton & Crawford Ave.

Details

Is the inlet/basin clogged?
Yes
Is the street flooding?
Yes
Is there an odor coming from the basin?
No

History

  1. July 13, 2020
    The service request is submitted.
  2. July 13, 2020
    The service request status has been changed to Assigned to Department.
  3. January 30, 2021
    The service request status has been changed to Completed.

Comments

  • Staff · July 13, 2020
    Cityworks ID: 422815
  • Staff · July 14, 2020
    Request will be relay to Field Supervisor for assessment please allow time 15 days for Supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
  • Staff · November 28, 2020
    M The location has 5 inlets that need service all at the corner of Barton and Crawford. The location does have a cave-in at 3103 Barton Ave it has been made safe. Also there is seem to be a plate at thislocation but is cover with asphalt need verify who plate belong and the issue for the placement for the plate which is in front of the inlet at 3100 Barton which is on the complaints coming from the citizens at this location. Photo are attach to request to show both the plate and the cave in at this location.
  • Staff · December 23, 2020
    M DPU Stormwater contractors PipeVision are assigned to this location have, crew clean location with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum. 3 of 6 inlets at this location were clean and inspected of those 3 inlets mud, leaves and roots were cleaned from them.
  • Staff · January 11, 2021
    completed by PipeVision on 12/22/2020 per Lockett....cleared 3 inlets of mud and roots