DPU000008206

Assess Standing Water

How we assembled this data →

CompletedClosed October 4, 2021
Requested
January 30, 2020
Subtype
Assess Stormwater
Location
2015 Dinwiddie Ave, 23224
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
8
Neighborhood
Blackwell

Description

Standing water that’s been there for days after last rain

Details

Problem area
Street
Is there standing water?
Yes
Is the problem in the rear of the property?
No
Is the problem in the front of the property?
Yes
Is the problem on the side of the property?
No
Is there a erosion issue?
No
Is the problem in the creek or stream?
No
Is this related to vegetation?
No

History

  1. January 31, 2020
    The service request is submitted.
  2. January 31, 2020
    The service request status has been changed to Assigned to Department.
  3. October 4, 2021
    The service request status has been changed to Completed.

Comments

  • Staff · January 31, 2020
    Cityworks ID: 413503
  • Staff · February 3, 2020
    lease allow 15 days for Supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
  • Staff · April 2, 2020
    think the questionable inlet is located at 2023 Dinwiddie Av.
  • Staff · December 28, 2020
    M This location had 3 of 3 inlets that were services and clean on the 12-21-20, N.Sumpter and W.Mayo with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum.
  • Staff · December 28, 2020
    M Last entry was enter in error.
  • Staff · December 28, 2020
    M This location had 6 of 6 inlets that were services and clean on the 12-21-20, N.Sumpter and W.Mayo with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum.
  • Staff · December 28, 2020
    M Location had bottles and leaves and sediments in the basins upon them being service.
  • Staff · October 4, 2021
    DPU Storm-Water Crew DPU Storm-Water Crew Chief N. Sumpter stated location is completed.w Chief N. Sumpter and Crew Supervisor, L.Lockett stated location is completed, per DPU contractors PipeVision inthe early summer of 2021