DPU000006076

Report Clearing or Erosion Issues on Construction Site

How we assembled this data →

CompletedClosed August 9, 2019
Requested
July 26, 2019
Subtype
Assess land disturbance or erosion
Location
1810 3rd Ave 23222
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
6
Neighborhood
Highland Park Southern Tip

Description

Contractors were told not to use the public right away and Street access they were told only to use alley access they have tracked mud over the entire block they have covered my car in dirt

Details

Is erosion/sediment from a construction site?
Yes
Is water/sediment leaving the construction site?
Yes
Does issue involve clearing of trees or vegetation
Yes
Is erosion or land clearing on private property?
Yes
Is public right of way or city property impacted?
Yes
Is erosion/drainage issue affecting your property?
Yes
Is the problem near a stream or the James River?
Yes

History

  1. July 26, 2019
    The service request is submitted.
  2. July 26, 2019
    The service request status has been changed to Assigned to Department.
  3. July 29, 2019
    The service request status has been changed to Assigned to Engineer.
  4. August 9, 2019
    The service request status has been changed to In Progress.
  5. August 9, 2019
    The service request status has been changed to Completed.

Comments

  • System · July 30, 2019
    A notice to comply has been emailed to the builder.
  • System · July 30, 2019
    Spoke with responsible land disturber and issues as outlined in the notice to comply have been met.
  • System · August 2, 2019
    RLD has complied
  • System · August 6, 2019
    Contractor has complied
  • Staff · August 9, 2019
    An inspection was conducted on 7-29-19. Pictures were taken of job site under construction by Richmond Habitat for Humanity. There was evidence of soil "tracking unto front roadway " due to contractor backfilling footers, in front. The site supervisor, Mrs. Mo Karn-Bruce ( 804.300.0023 ) was contacted and she scheduled to meet with City Inspector (s). An attempt to contact Mr. Kevin Moore ( 804.920.3937 ) resulted in a " mailbox full " message. A follow-up "Erosion/Sediment Control " Inspection was filed and recorded on 7-30-19. This inspection resulted in a " failed - with follow up required ( no fee ) ". The site supervisor was instructed to "seed and straw " front right-of-way and clean the roadway. A final inspection was conducted yesterday ( 8-8-19 ). Site had " seed and straw " applied and front roadway cleaned.