DPU000004687

Assess Standing Water

How we assembled this data →

CompletedClosed August 12, 2021
Requested
April 10, 2019
Subtype
Assess Stormwater
Location
1905 Oakdale Ave 23227
As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
Council District
3
Neighborhood
Rosedale

Description

Caller states storm water has been flooding Rosedale Ave behind her house and this also causes flooding to her property. She requests the city come out to assess.

Details

Problem area
Street
Is there standing water?
Yes
Is the problem in the rear of the property?
Yes
Is the problem in the front of the property?
No
Is the problem on the side of the property?
No
Is there a erosion issue?
Yes
Is the problem in the creek or stream?
No
Is this related to vegetation?
Yes

History

  1. April 10, 2019
    The service request is submitted.
  2. April 10, 2019
    The service request status has been changed to Assigned to Department.
  3. April 30, 2019
    The Reporter logged a follow-up request from a constituent.
  4. August 12, 2021
    The service request status has been changed to Completed.

Comments

  • Staff · April 10, 2019
    Cityworks ID: 393024
  • Staff · April 12, 2019
    Service request has been received and dispatched to Field Supervisor for assessment. Please allow 15 days for supervisor to complete assessment. Supervisor will contact requester upon completion of assessment.
  • System · April 30, 2019
    Caller wanted to check status - caller is concerned about property damage. She requests a call when the city comes out to assess.
  • Staff · December 29, 2020
    M This Request will be relayed to Field Supervisor for assessment please allow time 15 days for Supervisor to complete assessment. Supervisor will contact consumer upon completion of assessment. If deemed to be an ongoing issue, a separate request will be elevated Per Leonardo Lockett- S.Crew- This location has 1 mark basin and 1 inlet are need of service for cleaning. And are schedule to service for cleaning. There is also a cavitation at one of the basin that is in need of cleaning for service.
  • Staff · May 27, 2021
    inspected 5/18/2021 per Lockett....DPU Stormwater contractors PipeVision were assigned to this location, crew cleaned location with high water and vacuum truck. Crew cleaned sub and basin with high pressure hose and high pressure vacuum.
  • Staff · August 12, 2021
    DPU Stormwater contractors PipeVision were assigned to this location, crew cleaned location with high water and vacuum truck. Crew cleaned sub and basin with high pressure hose and high pressure vacuum. Cleaned and serviced 2