DPU000002202
Assess Standing Water
- Requested
- October 12, 2018
- Subtype
- Assess Stormwater
- Location
- 2318 N 23rd St
- As reported by the submitter and published by the City. May be the submitter’s address or another party’s; the City does not anonymize to block level.
- Council District
- 7
- Neighborhood
- Fairfield
Description
Storm drain not draining
Details
- Problem area
- Pipe
- Is there standing water?
- Yes
- Is the problem in the rear of the property?
- Yes
- Is the problem in the front of the property?
- Yes
- Is the problem on the side of the property?
- Yes
- Is there a erosion issue?
- No
- Is the problem in the creek or stream?
- No
- Is this related to vegetation?
- No
History
- October 12, 2018The service request is submitted.
- October 12, 2018The service request status has been changed to Assigned to Department.
- December 21, 2020The service request status has been changed to Completed.
Comments
- Staff · December 21, 2020M DPU Stormwater contractors PipeVision are assigned to this location have, crew clean location with high water and vacuum truck. Crew clean sub and basin with high pressure hose and high pressure vacuum. Two inlets at this location were service for cleaning roots and leaves were present.