Beta release. We are still refining and welcome feedback.
← RVA Metrics

Notes / 311 / Planning & Development Review

Planning & Development Review (PDR)

Last revised: July 2026.

PDR handles code enforcement — zoning violations, building maintenance, garbage accumulation, tall grass, abandoned vehicles. A PDR request is closed in RVA311 the moment it’s transferred to PDR’s separate Code Enforcement system — often within a day — not when the underlying issue is fixed. So the completion rates and resolution times below reflect that hand-off, not whether the problem was resolved: near-total completion and fast median times are expected for PDR and aren’t comparable to other departments. The City plans to replace this system (targeted for late 2026 or early 2027), which may change what completion records.

See PDR’s SLA performance →Geography not available for PDR

Currently open
25
Total requests (2022+)
21,054
Completed (2022+)
21,032

Includes records the City’s system still flags as open, regardless of last-activity date. About 12% of currently-open PDR requests were submitted before 2022 and most have not been modified in years. See methodology for how this number relates to the City’s published charts.

What’s in Play Each Month

Last 6 fully-elapsed months — the current month is excluded because it’s still accumulating. As the intro above notes, PDR requests close almost immediately on hand-off to Code Enforcement, so “new, closed” dominates here far more than on DPW or DPU — that’s expected, not a data quality issue.

How One Ticket Moves

Month 1: opens

Counted as New

Month 2: still open

Now counted as Backlog

Month 3: closes

Counted as Backlog, cleared

If it had closed back in Month 1 instead, it counts as New, closed and never becomes backlog at all.

MonthBacklog, still openBacklog, clearedNew, still openNew, closed
May 202652937424
Jun 20265378562
Jul 20265817714
Aug 202651725742
Sep 202652518555
Oct 202651814390

Open Requests by Subtype

Subtypes with no currently-open requests omitted from the chart; they appear in the table below.

Completion rate vs median resolution days

Each point is a subtype. X = median calendar days from submission to closure. Y = share of submitted requests that have closed. Point size = total volume.

Subtype detail

SubtypeOpenTotalCompletion %Median days
Residential Construction551199.6%2
Garbage Accumulation43,25699.9%1
Interior Maintenance Issue41,59799.7%1
Exterior Maintenance Issue33,53399.9%1
Tall Grass over 12 inches high35,68299.9%1
Building Setback Violation25396.2%2
AirBnB or similar short term rental without permit117999.4%2
Brush/Tree Obstruction12,125100.0%1
Operating a Business without Permits112699.2%2
Report Inoperable/Abandoned Vehicle Location189899.9%1
Air BnB or similar short term rental without permit081100.0%3
Buffer or Screening Requirements Not Met027100.0%3
Business Construction097100.0%2
Fence Too High026100.0%4
Illegal Auto Repair0108100.0%3
Illegal Business in Residence0200100.0%3
Illegal Rooming or Boarding House0253100.0%4
Illegal or Excessive Signage on private property0108100.0%6
Improper Tire Storage050100.0%1
No Electricity in Building031100.0%1
No Water in Building066100.0%1
No/Inadequate Heat in Building0102100.0%1
Open and Vacant Building0239100.0%1
Parking Commercial Vehicles at Residence090100.0%2
Parking Requirements not met055100.0%4
Pests/Insects/Vermin0567100.0%1
Standing Water076100.0%1
Too many people in a residence0133100.0%3
Unsafe Building0607100.0%1
Unscreened Dumpster044100.0%5
Zoning Violation of a Special Use or BZA approval0134100.0%3

Open is the all-time count of currently-open requests. Total, Completion %, and Median days are computed from requests submitted 2022 onward; subtypes with fewer than 25 requests in that window show —.

Definitions, status codes, and limitations: RVA311 methodology.